Basic Principles Of PP Pipe Extruders

Mar 09, 2026 Leave a message

Stage One: Plasticization and Conveying in the Extruder
1. Solid Conveying Section: After entering the screw from the hopper, PP solid pellets first reach this section. Here, the material is compacted into a "solid plug" and begins preheating under the combined effects of external barrel heating and rotational friction heat from the screw, preparing for melting.

2. Melting and Compression Section: This is the most critical zone. The screw flute depth gradually decreases here, generating intense shear and compression forces on the material. Simultaneously, with precise heating, PP pellets fully melt into a viscous flow state. This section also expels entrapped gases from the material.

3. Homogenization and Metering Section: The molten PP undergoes further mixing and homogenization here, stabilizing its temperature and flow rate. Finally, the screw functions like a precision metering pump, delivering the uniform melt to the die head at constant pressure and flow rate.

 

Stage Two: Die Forming and Secondary Molding
1. Die Forming: The melt passes through a screw-type manifold die or basket die. These dies, specifically designed for PP, eliminate material "memory" effects and weld lines, ensuring more uniform pressure distribution within the die. This guarantees dense pipe walls with consistent thickness. Some advanced designs incorporate a static mixer downstream of the die to further enhance melt temperature and composition uniformity.

2. Sizing and Cooling: The pipe blank extruded from the die is extremely hot and lacks sufficient strength. It immediately enters a vacuum sizing chamber where vacuum pressure forces it against the inner wall of the sizing sleeve, precisely defining the pipe's outer diameter and roundness. Subsequently, the pipe passes through spray cooling tanks or water baths, where multi-stage water cooling fully solidifies it.

3. Drawing and Cutting: The cooled pipe is continuously drawn out at a constant speed by a belt-type drawing machine, ensuring production line stability. Finally, a cutting machine (typically using chip-free cutting) automatically severs the pipe to the preset length, completing the production of the finished pipe.