I. Pre-startup Preparation
1.Equipment Inspection:
Check that all fasteners (e.g., screws, die head connecting bolts) are securely fastened, and that safety protection devices are complete and functional.
Check that the oil level and oil temperature of the main motor, gearbox and lubrication system are within the normal range.
Check that the water circuits of the cooling system (sink, sizing sleeve, mold water lines) are unobstructed and free of leakage.
Confirm that there are no foreign objects or tools inside the equipment and around the hopper.
2.Mold and Sizing Device Installation:
Install the die head, sizing sleeve and sealing device correctly in accordance with the production specifications.
Ensure the mold is centered during installation with tight connections to prevent material leakage.
3.Material Preparation:
Verify the type, color and drying status (if drying is required) of the plastic raw materials used (e.g., PE, PP, PVC, etc.).Check the cleanliness of the hopper and clean the filter screen if necessary.
4.Temperature Setting and Preheating:
Set the heating temperatures of each temperature zone (barrel, die head) in accordance with the process card requirements.
Start the heating system and begin preheating. Ensure a sufficient preheating period to achieve complete plasticization of the material (usually more than 30 minutes).
Proceed to the next operation only after the temperature of each zone reaches the set value and stabilizes.
II. Startup and Operation Procedures
1.Startup Sequence:
Start the circulating cooling water system to ensure the normal cooling of the mold and sizing box.
Start the main motor (extruder screw) at a low speed and check that the current and voltage are within the normal range.
Add materials to the hopper in small quantities and slowly, and closely monitor the discharge of the extruder.
When the material is extruded uniformly from the die orifice (the material at this stage is fully plasticized and can be discarded), pull the pipe blank into the sizing sleeve and cooling water tank at a low speed.
After the pipe has fully passed through the traction machine, start the traction machine and cutting machine (or winder) synchronously, and gradually adjust the speed of each unit to match the process parameters.
2.Process Parameter Adjustment and Stable Production:
Gradually increase the speed: Slowly raise the screw rotation speed and traction speed to the range specified by the process.
Key Monitoring Points:Temperature: Monitor the deviation between the actual temperature and the set value of each temperature zone; sharp fluctuations are strictly prohibited.Current/Torque: Monitor the main motor current. An abnormal rise may indicate poor plasticization or a risk of material blockage.Vacuum sizing pressure/Internal pressure sizing pressure: Keep stable to ensure the outer diameter and roundness of the pipe.Cooling water temperature and flow rate: Ensure the pipe is fully cooled and shaped to reduce internal stress.
III. In-operation Monitoring and Product Quality Inspection
1.Equipment Status Monitoring: Pay close attention to the equipment for any abnormal vibration, noise or peculiar smell at all times.
2.Visual Inspection of Product Quality:
Appearance: Check that the pipe surface is smooth and uniformly colored, with no defects such as impurities, scratches, air bubbles or dents.
Dimensions: Measure the pipe's outer diameter and wall thickness with a caliper at regular intervals (e.g., every 15-30 minutes) to ensure they are within the tolerance range.
Printed Markings: Inspect that the inkjet-printed content is clear, complete and correctly positioned.
IV. Normal Shutdown Operation
Sequential Shutdown
Stop feeding materials into the hopper and empty the materials in the extruder as much as possible.
Gradually reduce the screw speed to the minimum.
Turn off the heating power supply of the main motor and stop the traction machine and cutting machine.
Shut down the main motor.
After the die head stops extruding, turn off the cooling water system and vacuum pump.
For long-term shutdown or material changeover, thoroughly clean the screw and die head with cleaning compound (or special natural-color cleaning compound).