I. Temperature Control and Heat Retention

PVC is highly temperature-sensitive and readily decomposes when exposed to prolonged high temperatures in a static state.

1. Lower Set Temperature: If idle time is expected to exceed 15-20 minutes, reduce barrel and head temperatures to approximately 140°C-150°C (below PVC's glass transition temperature, yet maintaining sufficient heat to shorten next startup time). Do not completely shut off heating, as material cooling, contraction, and subsequent reheating may cause bubbling or degradation.

2. Prevent Localized Overheating: Ensure heating elements function properly and temperature controllers display accurate readings to avoid actual temperature spikes due to control failures.

3. Die Insulation: The die is the area with the highest material retention. Monitor die temperatures closely to prevent scorching of the melt.

 

II. Low-Speed Operation

1. Scheduled Rotation/Low-Speed Operation: For extended standby periods, it is recommended to start the main unit at low speed (5-10 rpm) every 10-15 minutes and idle for several seconds. This allows PVC within the screw to flow, preventing material from adhering to the screw due to prolonged stagnation. Simultaneously, shear action helps dissipate accumulated heat.

2. Preventing Degradation: Complete inactivity allows localized heat conduction to expose material to prolonged temperatures, rapidly causing yellow streaks or black spots to form.

 

III. Cooling System Management

1. Shut Off Cooling Water: During standby, material does not require plasticization and shear heat is minimal. Turn off the cooling water for the barrel and screw (or reduce valve flow) to prevent excessive temperature fluctuations caused by water-induced heat loss, which could affect subsequent startup.

2. Die Gap Protection: Inspect the die opening at the die head to ensure no foreign objects are present. If necessary, apply a small amount of high-temperature grease to prevent oxidation or scratching of the die opening.

 

IV. Hopper and Feeding

1. Close the feed gate: Shut the slide gate beneath the hopper and stop the feeder.

2. Preserve residual material: Maintain PVC material inside the barrel to isolate it from air during standby, preventing oxidation of the screw and barrel walls.

3. Moisture protection: If the standby environment is humid, ensure the PVC raw material in the hopper is covered to prevent moisture absorption.

 

V. Energy Consumption and Safety

1. Energy-Saving Mode: If extended downtime is anticipated (e.g., exceeding 2 hours) and production resumption timing remains uncertain, it is recommended to completely discharge materials, clean the machine, and shut it down rather than maintaining prolonged low-temperature insulation. Prolonged insulation consumes electricity and carries risks of material degradation.

2. Inspection: During standby periods, assign personnel to periodically check the temperature controller for alarms and inspect the extruder head for signs of material dripping or smoke emission.